Skip to content

Merge pull request #47 from zumba/optimization #9

Merge pull request #47 from zumba/optimization

Merge pull request #47 from zumba/optimization #9

Triggered via push April 3, 2024 13:23
Status Failure
Total duration 2m 16s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (7.4)
The job could not retrieve the repository token.
build (7.2)
The job could not retrieve the repository token.
build (8.2)
The job could not retrieve the repository token.
build (7.3)
The job could not retrieve the repository token.
build (8.1)
The job was canceled because "_7_4" failed.
build (8.1)
A task was canceled.
build (8.0)
The job was canceled because "_7_4" failed.
build (8.0)
A task was canceled.