Skip to content

Update elixirc_paths #9

Update elixirc_paths

Update elixirc_paths #9

Triggered via push December 5, 2023 13:02
Status Failure
Total duration 23s
Artifacts

main.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test (Elixir 1.11.4, OTP 21.3)
Process completed with exit code 1.
Test (Elixir 1.15, OTP 26.0)
The job was canceled because "_1_11_4_21_3" failed.
Test (Elixir 1.15, OTP 26.0)
The operation was canceled.
Test (Elixir 1.14.5, OTP 25.3)
The job was canceled because "_1_11_4_21_3" failed.