Skip to content

Commit

Permalink
Update principles.adoc (#43)
Browse files Browse the repository at this point in the history
  • Loading branch information
efucile authored Feb 15, 2024
1 parent 3bbb043 commit ecfc234
Showing 1 changed file with 2 additions and 2 deletions.
4 changes: 2 additions & 2 deletions transition-guide/sections/principles.adoc
Original file line number Diff line number Diff line change
Expand Up @@ -5,15 +5,15 @@ The following principles are appropriate for the transition:

**Principle **1: Each NMHS will be able to make the migration during the agreed period 2025-2030:
* Considering the fact that not all centres have the same skills and facilities, and the operational aspects of WIS and the risks involved in a big-bang approach, the WIS node implementation would not be fully implemented at the same time
* NMHSs will migrate between 2025 and 2030 at a time convenient for them. There will not be a simultaneous migration of all the WIS Centers from WIS1 to WIS2.
**Principle 2**: No GTS data loss during the transition:

* During the pre-operational phase, and in coordination with the regional associations and GISCs, WIS2 infrastructure will be established in order to avoid data loss during the transition. The aim of this infrastructure is to ensure that data sent on the GTS can be received by a site having migrated on WIS2, and data, previously sent on the GTS, sent on WIS2 can be received by a site still on the GTS
**Principle 3**: Each Centre will decide when decommissioning the WIS1 and GTS:

* Decommissioning WIS1 services, as well as GTS ones, will be the decision of each NC/DCPC/GISC when they will consider that their and their user’s migration is completed
* Decommissioning WIS1 and GTS services will be the decision of each NC/DCPC/GISC when they will consider that the migration is complete for them and their users.
* After migration to WIS2, It is not required to run an MSS to receive or send data from Centres not having made the transition. The Centre will decide when and if they want to stop their Message Switching System MSS. They can also stop the data dissemination to GTS
**Principle 4**: New data (eg. GBON, Climate, Hydrology, Cryosphere) will be exchanged solely on WIS2:
Expand Down

0 comments on commit ecfc234

Please sign in to comment.