Skip to content

Commit

Permalink
s/center/centre/g
Browse files Browse the repository at this point in the history
  • Loading branch information
tomkralidis committed Sep 26, 2023
1 parent 2e2adb5 commit 7b24686
Show file tree
Hide file tree
Showing 2 changed files with 4 additions and 4 deletions.
2 changes: 1 addition & 1 deletion transition-guide/sections/introduction.adoc
Original file line number Diff line number Diff line change
Expand Up @@ -5,4 +5,4 @@ The WMO Information System 2.0 (WIS2) will be implemented according to the sched
.WIS2 implementation timeline
image::images/wis2-timeline.png[WIS2 implementation timeline]

According to the WIS2 implementation plan (see figure 1), the Global Telecommunication System (GTS) will be decommissioned by 2030, and National Meteorological and Hydrological Services NMHSs will use the WIS2 platform for data exchange. During the transition period, there will be a mix of centers operating WIS2 and WIS/GTS. Some of them will be running both data-sharing frameworks simultaneously, with the difficulties associated with maintaining two operational systems for the same purpose. Therefore, a transition plan will be developed during the pilot phase, taking into account the time necessary for Members to migrate to the new systems and reducing, at the minimum, the time of parallel operation of both systems for a Member.
According to the WIS2 implementation plan (see figure 1), the Global Telecommunication System (GTS) will be decommissioned by 2030, and National Meteorological and Hydrological Services NMHSs will use the WIS2 platform for data exchange. During the transition period, there will be a mix of centres operating WIS2 and WIS/GTS. Some of them will be running both data-sharing frameworks simultaneously, with the difficulties associated with maintaining two operational systems for the same purpose. Therefore, a transition plan will be developed during the pilot phase, taking into account the time necessary for Members to migrate to the new systems and reducing, at the minimum, the time of parallel operation of both systems for a Member.
6 changes: 3 additions & 3 deletions transition-guide/sections/principles.adoc
Original file line number Diff line number Diff line change
Expand Up @@ -5,7 +5,7 @@ The following principles are appropriate for the transition:

**Principle **1: Each NMHS will be able to make the migration during the agreed period 2025-2030:
* Considering the fact that not all centers have the same skills and facilities, and the operational aspects of WIS and the risks involved in a big-bang approach, the WIS node implementation would not be fully implemented at the same time
* Considering the fact that not all centres have the same skills and facilities, and the operational aspects of WIS and the risks involved in a big-bang approach, the WIS node implementation would not be fully implemented at the same time
**Principle 2**: No GTS data loss during the transition:

Expand All @@ -14,8 +14,8 @@ The following principles are appropriate for the transition:
**Principle 3**: Each Centre will decide when decommissioning the WIS1 and GTS:

* Decommissioning WIS1 services, as well as GTS ones, will be the decision of each NC/DCPC/GISC when they will consider that their and their user’s migration is completed
* After migration to WIS2, It is not required to run an MSS to receive or send data from Centers not having made the transition. The Center will decide when and if they want to stop their Message Switching System MSS. They can also stop the data dissemination to GTS
* After migration to WIS2, It is not required to run an MSS to receive or send data from Centres not having made the transition. The Centre will decide when and if they want to stop their Message Switching System MSS. They can also stop the data dissemination to GTS
**Principle 4**: New data (eg. GBON, Climate, Hydrology, Cryosphere) will be exchanged solely on WIS2:

* WIS2 is designed to to enable the WMO Unified Data Policy, and to support the WMO Global Basic Observing Network. The new data will be available on WIS2. A center not having made the migration to WIS2 will not receive the new data. This data will not have a GTS headers TTAAii and will not be exchanged over the GTS
* WIS2 is designed to to enable the WMO Unified Data Policy, and to support the WMO Global Basic Observing Network. The new data will be available on WIS2. A centre not having made the migration to WIS2 will not receive the new data. This data will not have a GTS headers TTAAii and will not be exchanged over the GTS

0 comments on commit 7b24686

Please sign in to comment.