Skip to content

trmcnealy/MultiPorosityModel

Repository files navigation

Multi-Phase Multi-Porosity Model Tool

Projects Menu

Settings Menu

DataSource

Database Connection

Map view of the wells in the database

Selected well's monthly production in the database

Imported monthly production

Converting Monthly to Daily production using a regression algorithm on the cumulative production

Relative Permeability Curves (Matrix)

Relative Permeability Curves (Hydraulic Fractures)

Relative Permeability Curves (Natural Fractures)

Well input parameters

PVT

PVT correlation models

Relative Permeabilities @ PVT Saturations

Model input parameters

History Matching input parameters

Gpu Usage

History Matching Results

Production Data Smoothing & Model Predictions currently being developed

About

No description, website, or topics provided.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages