*: support configuring tso switch #22270
pd-tests.yaml
on: pull_request
Matrix: chunks
report-coverage
0s
Annotations
9 errors
chunks (10, MicroService Integration(TSO))
Process completed with exit code 2.
|
chunks (7, Client Integration Test)
The job was canceled because "_10_MicroService_Integrat" failed.
|
chunks (7, Client Integration Test)
The operation was canceled.
|
chunks (8, TSO Integration Test)
The job was canceled because "_10_MicroService_Integrat" failed.
|
chunks (8, TSO Integration Test)
The operation was canceled.
|
chunks (4, Tests(1))
The job was canceled because "_10_MicroService_Integrat" failed.
|
chunks (4, Tests(1))
The operation was canceled.
|
chunks (6, Tools Test)
The job was canceled because "_10_MicroService_Integrat" failed.
|
chunks (6, Tools Test)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cover-reports-1
|
174 KB |
|
cover-reports-2
|
115 KB |
|
cover-reports-3
|
193 KB |
|
cover-reports-5
|
203 KB |
|
cover-reports-9
|
227 KB |
|