Skip to content

Updating CI for Jazzy #221

Updating CI for Jazzy

Updating CI for Jazzy #221

Triggered via pull request September 6, 2024 02:27
Status Failure
Total duration 3m 3s
Artifacts

main.yml

on: pull_request
Matrix: industrial_ci
Fit to window
Zoom out
Zoom in

Annotations

14 errors
industrial_ci (humble, main)
The job was canceled because "jazzy_main" failed.
industrial_ci (humble, main)
The operation was canceled.
industrial_ci (jazzy, testing)
The job was canceled because "jazzy_main" failed.
industrial_ci (rolling, main)
The job was canceled because "jazzy_main" failed.
industrial_ci (jazzy, testing)
The operation was canceled.
industrial_ci (rolling, main)
The operation was canceled.
industrial_ci (rolling, testing)
The job was canceled because "jazzy_main" failed.
industrial_ci (rolling, testing)
The operation was canceled.
industrial_ci (humble, testing)
The job was canceled because "jazzy_main" failed.
industrial_ci (humble, testing)
The operation was canceled.
industrial_ci (iron, testing)
The job was canceled because "jazzy_main" failed.
industrial_ci (iron, testing)
The operation was canceled.
industrial_ci (iron, main)
The job was canceled because "jazzy_main" failed.
industrial_ci (iron, main)
The operation was canceled.