Skip to content

Update dependency aspect_bazel_lib to v2.10.0 #4645

Update dependency aspect_bazel_lib to v2.10.0

Update dependency aspect_bazel_lib to v2.10.0 #4645

Triggered via push December 20, 2024 11:36
Status Failure
Total duration 3m 39s
Artifacts

go-lint.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

2 errors
go-lint
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
go-lint
The operation was canceled.