Skip to content

Configure consumer threads #223

Configure consumer threads

Configure consumer threads #223

Triggered via pull request January 8, 2025 08:06
Status Failure
Total duration 19s
Artifacts

build.yml

on: pull_request
Matrix: Gem / Test
Gem / Release
0s
Gem / Release
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Gem / Test (3.2)
The process '/opt/hostedtoolcache/Ruby/3.2.6/x64/bin/bundle' failed with exit code 16
Gem / Test (3.1)
The job was canceled because "_3_2" failed.
Gem / Test (3.1)
The process '/opt/hostedtoolcache/Ruby/3.1.6/x64/bin/bundle' failed with exit code 16
Gem / Test (3.0)
The job was canceled because "_3_2" failed.
Gem / Test (3.0)
The process '/opt/hostedtoolcache/Ruby/3.0.7/x64/bin/bundle' failed with exit code 16
Gem / Test (2.7)
The job was canceled because "_3_2" failed.
Gem / Test (2.7)
The operation was canceled.
Gem / Test (3.3)
The job was canceled because "_3_2" failed.
Gem / Test (3.3)
The operation was canceled.
Gem / Test (3.2)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636