Skip to content

Merge pull request #316 from hgourvest/dependabot/npm_and_yarn/babel/… #112

Merge pull request #316 from hgourvest/dependabot/npm_and_yarn/babel/…

Merge pull request #316 from hgourvest/dependabot/npm_and_yarn/babel/… #112

Triggered via push October 17, 2023 14:47
Status Failure
Total duration 6h 0m 28s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

node.js.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (16, v3)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
build (16, v3)
The operation was canceled.
build (14, v3)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
build (14, v3)
The operation was canceled.