e3: adding the proper pruned node (known as full node) #8299
test-integration.yml
on: pull_request
Matrix: tests-windows
Matrix: tests
Annotations
9 errors
tests-windows (windows-2022)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
|
tests-windows (windows-2022):
cmd/capcli/cli.go#L534
not enough arguments in call to snapshotsync.WaitForDownloader
|
tests-windows (windows-2022)
The operation was canceled.
|
tests (ubuntu-22.04)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
|
tests (ubuntu-22.04):
cmd/capcli/cli.go#L534
not enough arguments in call to snapshotsync.WaitForDownloader
|
tests (ubuntu-22.04)
The operation was canceled.
|
tests (macos-13)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
|
tests (macos-13):
cmd/capcli/cli.go#L534
not enough arguments in call to snapshotsync.WaitForDownloader
|
tests (macos-13)
The operation was canceled.
|