Skip to content

chore: Upgrade to Pillow 10.0.1 #1393

chore: Upgrade to Pillow 10.0.1

chore: Upgrade to Pillow 10.0.1 #1393

Triggered via pull request October 14, 2023 08:08
Status Failure
Total duration 13m 5s
Artifacts

ci.yml

on: pull_request
Matrix: lint
Matrix: test-mongodb
Matrix: test-mssql
Matrix: test-mysql
Matrix: test-postgres
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test-postgres (3.7)
Process completed with exit code 1.
test-postgres (3.9)
The job was canceled because "_3_7" failed.
test-postgres (3.9)
The operation was canceled.
test-postgres (3.8)
The job was canceled because "_3_7" failed.
test-postgres (3.8)
The operation was canceled.
test-mongodb (3.7)
Process completed with exit code 1.