test: improve hertz/pkg/routeut
unit test coverage (#992)
#3223
tests.yml
on: push
Matrix: compat-test
Matrix: hz-test-unix
Matrix: hz-test-windows
Matrix: lint-and-ut
Matrix: ut-windows
Annotations
8 errors
lint-and-ut (1.19)
Process completed with exit code 1.
|
lint-and-ut (1.20)
The job was canceled because "_1_19" failed.
|
lint-and-ut (1.18)
The job was canceled because "_1_19" failed.
|
ut-windows (1.20)
Process completed with exit code 1.
|
ut-windows (1.19)
The job was canceled because "_1_20" failed.
|
ut-windows (1.19)
The operation was canceled.
|
ut-windows (1.18)
The job was canceled because "_1_20" failed.
|
ut-windows (1.18)
The operation was canceled.
|