Skip to content

NetBox initial charm #13

NetBox initial charm

NetBox initial charm #13

Status Cancelled
Total duration 10m 6s
Artifacts

integration_tests.yml

on: pull_request
integration-tests  /  ...  /  Get runner image
4s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
6s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
8s
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
2m 54s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
integration-tests / Build and push charm
The run was canceled by @javierdelapuente.
integration-tests / Build and push charm
The operation was canceled.
integration-tests / Build rock / Build rock (.)
The run was canceled by @javierdelapuente.
integration-tests / Build rock / Build rock (.)
The operation was canceled.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Node.js 16 actions are deprecated. Please update the following actions to use Node.js 20: charmed-kubernetes/actions-operator@main. For more information see: https://github.blog/changelog/2023-09-22-github-actions-transitioning-from-node-16-to-node-20/.