met à jour la description de la bourse de college pour davantage de c… #9804
ci.yml
on: push
Install
17s
Install OpenFisca
25s
Build contribuer/ static site
43s
Check openfisca requirement changes
4s
health-check
0s
Matrix: End-to-End Tests
Openfisca definition periods tests
0s
Check benefit link improvements and update link table if necessary
0s
Detect failure
0s
Annotations
11 errors
health-check
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
|
End-to-End Tests (family)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
|
End-to-End Tests (family)
The operation was canceled.
|
End-to-End Tests (base)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
|
End-to-End Tests (base)
The operation was canceled.
|
End-to-End Tests (student)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
|
End-to-End Tests (student)
The operation was canceled.
|
End-to-End Tests (patrimoine)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
|
End-to-End Tests (patrimoine)
The operation was canceled.
|
End-to-End Tests (handicap)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
|
End-to-End Tests (handicap)
The operation was canceled.
|