Skip to content

minor touchups

minor touchups #4534

Re-run triggered November 4, 2024 03:01
Status Success
Total duration 6m 4s
Artifacts 57

build.yml

on: push
Matrix: Compile
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

5 warnings
Compile (24)
Cache cleanup failed. Will continue. Error: The process '/usr/bin/gradle' failed with exit code 1
Tests (guava:check, 23)
Failed to download action 'https://api.github.com/repos/step-security/harden-runner/tarball/91182cccc01eb5e619899d80e4e971d6181294a7'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Tests (guava:check, 23)
Back off 26.917 seconds before retry.
Tests (guava:check, 23)
Failed to download action 'https://api.github.com/repos/step-security/harden-runner/tarball/91182cccc01eb5e619899d80e4e971d6181294a7'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Tests (guava:check, 23)
Back off 12.508 seconds before retry.

Artifacts

Produced during runtime
Name Size
caffeine-weakKeysAndWeakValuesStatsSyncCaffeineSlowTest-11-results Expired
403 KB