Skip to content

chore(deps): update bcgov-nr/action-builder-ghcr action to v2.3.0 (#266) #210

chore(deps): update bcgov-nr/action-builder-ghcr action to v2.3.0 (#266)

chore(deps): update bcgov-nr/action-builder-ghcr action to v2.3.0 (#266) #210

Triggered via push November 27, 2024 22:35
Status Failure
Total duration 10m 38s
Artifacts

merge.yml

on: push
Set Variables
4s
Set Variables
Matrix: GHCR Cleanup
Deploy (prod)  /  Helm
Deploy (prod) / Helm
Matrix: Integration Tests for APIs
Matrix: Promote Images
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
Deploy (test) / Helm
The job running on runner GitHub Actions 305 has exceeded the maximum execution time of 10 minutes.
Deploy (test) / Helm
The operation was canceled.
Deploy (test) / Helm
Multiple files were found for oc that matched the current OS and architecture: openshift-client-linux-4.14.41.tar.gz, openshift-client-linux-arm64-4.14.41.tar.gz, openshift-client-linux-ppc64le-4.14.41.tar.gz. Selecting the first one.