Skip to content

update

update #503

Re-run triggered January 3, 2025 14:00
Status Cancelled
Total duration 6m 20s
Artifacts

ci.yaml

on: push
macos-precompiled
1m 47s
macos-precompiled
Matrix: Lint
Matrix: linux-precompiled-libvips
Matrix: linux-precompiled
Matrix: linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Lint (1.17.x, 27.x)
Process completed with exit code 1.
Test Compiled - Elixir 1.15.x / OTP 26.x
The run was canceled by @akash-akya.
Test Compiled - Elixir 1.15.x / OTP 26.x
The operation was canceled.
Test Compiled - Elixir 1.16.x / OTP 26.x
The run was canceled by @akash-akya.
Test Compiled - Elixir 1.16.x / OTP 26.x
The operation was canceled.