Skip to content

Commit

Permalink
[skip-ci] add info to release 6.3
Browse files Browse the repository at this point in the history
  • Loading branch information
danieldeidda committed Nov 18, 2024
1 parent b5ac6f1 commit 16a43c9
Showing 1 changed file with 5 additions and 1 deletion.
6 changes: 5 additions & 1 deletion documentation/release_6.3.htm
Original file line number Diff line number Diff line change
Expand Up @@ -28,11 +28,15 @@ <h3>New functionality</h3>
<li>
Data from GE Discovery MI systems in RDF9 should now be readable. TOF information on these scanners has also been added.
However, projection data is currently still always returned as non-TOF (but list-mode data is read as TOF).<br>
<a href=https://github.com/UCL/STIR/pull/1503>PR #1503</a>
<a href=https://github.com/UCL/STIR/pull/1519>PR #1503</a>
</li>
<li>
<tt>stir_timings</tt> has now an extra option to parse a par-file for a projector-pair.
</li>
<li>
Duration in sinogram interfile/exam_info obtained from lm_to_projdata has the correct value if we unlist all the events. This is not true for Root files
<a href=https://github.com/UCL/STIR/pull/1503>PR #1503</a>
</li>
</ul>


Expand Down

0 comments on commit 16a43c9

Please sign in to comment.