Skip to content

1.3 -> 1.4

1.3 -> 1.4 #800

Triggered via push September 19, 2024 02:52
Status Failure
Total duration 20m 12s
Artifacts

ci.yml

on: push
Matrix: libraries
Matrix: testing
Matrix: integration
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

8 errors
integration (3.11)
Process completed with exit code 1.
testing (3.11)
Process completed with exit code 1.
testing (3.10)
The job was canceled because "_3_11" failed.
testing (3.10)
The operation was canceled.
testing (3.8)
The job was canceled because "_3_11" failed.
testing (3.8)
The operation was canceled.
testing (3.9)
The job was canceled because "_3_11" failed.
testing (3.9)
The operation was canceled.