Skip to content

REmove old file

REmove old file #788

Triggered via push September 18, 2024 15:12
Status Failure
Total duration 21m 53s
Artifacts

ci.yml

on: push
Matrix: libraries
Matrix: testing
Matrix: integration
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

8 errors
integration (3.11)
Process completed with exit code 1.
testing (3.11)
Process completed with exit code 1.
testing (3.8)
The job was canceled because "_3_11" failed.
testing (3.8)
The operation was canceled.
testing (3.9)
The job was canceled because "_3_11" failed.
testing (3.9)
The operation was canceled.
testing (3.10)
The job was canceled because "_3_11" failed.
testing (3.10)
The operation was canceled.