From ab0f53f22e97704c944ea4e6b89d465f4e5b933f Mon Sep 17 00:00:00 2001 From: Anna Milan Date: Tue, 3 Sep 2024 13:35:09 +0200 Subject: [PATCH] final edits from English editors of publication in LSP (#58) --- transition-guide/sections/management_of_wis1_and_gts.adoc | 2 +- transition-guide/sections/preamble.adoc | 2 +- transition-guide/sections/references.adoc | 4 ++-- transition-guide/sections/temporary_global_services.adoc | 4 ++-- 4 files changed, 6 insertions(+), 6 deletions(-) diff --git a/transition-guide/sections/management_of_wis1_and_gts.adoc b/transition-guide/sections/management_of_wis1_and_gts.adoc index e57dc7d..c372643 100644 --- a/transition-guide/sections/management_of_wis1_and_gts.adoc +++ b/transition-guide/sections/management_of_wis1_and_gts.adoc @@ -1,4 +1,4 @@ -== 5. MANAGEMENT OF WIS2 AND GTS +== 5. MANAGEMENT OF WIS1 AND GTS During the transition to WIS2, maintaining a very high level of service of WIS1 and GTS is key to ensuring that all Members and WIS users can send and receive the data required to run their operations, regardless of whether they have migrated to WIS2 or are still relying on the GTS. As described earlier, the WIS2 to GTS gateway and the GTS to WIS2 gateway will have a key role in this. The present section describes what Members are required to do during this transition, depending on their role within the GTS and WIS1. diff --git a/transition-guide/sections/preamble.adoc b/transition-guide/sections/preamble.adoc index b0ea1cb..01de531 100644 --- a/transition-guide/sections/preamble.adoc +++ b/transition-guide/sections/preamble.adoc @@ -1,3 +1,3 @@ == PREAMBLE -The present publication establishes the provisions for the transition from the WMO Information System (WIS) 1.0 and the Global Telecommunication System (GTS) to WIS 2.0. The provisions for the WIS2 transition provide technical guidance and describe the practices to be followed by Members to implement WIS 2.0 and decommission the WIS 1.0 and GTS systems. The practices described in this publication facilitate a smooth implementation of the technical regulation described in the https://library.wmo.int/idurl/4/68731[_Manual on WMO Information System_] (WMO-No. 1060), Volume II (hereinafter _Manual on WIS_, Volume II), and further explained in the https://library.wmo.int/idurl/4/28988[_Guide to the WMO Information System_] (WMO-No. 1061), Volume II (hereinafter _Guide to WIS_, Volume II). +The present publication establishes the provisions for the transition from the WMO Information System (WIS) 1.0 and the Global Telecommunication System (GTS) to WIS 2.0. The provisions for the WIS2 transition provide technical guidance and describe the practices to be followed by Members to implement WIS 2.0 and decommission the WIS 1.0 and GTS systems. The practices described in this publication facilitate a smooth implementation of the technical regulation described in the https://library.wmo.int/idurl/4/68731[_Manual on the WMO Information System_] (WMO-No. 1060), Volume II (hereinafter _Manual on WIS_, Volume II), and further explained in the https://library.wmo.int/idurl/4/28988[_Guide to the WMO Information System_] (WMO-No. 1061), Volume II (hereinafter _Guide to WIS_, Volume II). diff --git a/transition-guide/sections/references.adoc b/transition-guide/sections/references.adoc index ef3c3f0..a640345 100644 --- a/transition-guide/sections/references.adoc +++ b/transition-guide/sections/references.adoc @@ -2,11 +2,11 @@ === 7.1 Normative -* https://library.wmo.int/idurl/4/68731[_Manual on the WMO Information System_] (WMO-No. 1060), Volume II +* https://library.wmo.int/idurl/4/68731[_Manual on the WMO Information System_] (WMO-No. 1060), Volume II (the following appendices were adopted in Resolution 15 of the seventy-eighth session of the Executive Council (EC-78) and are available in the 2024 edition of the _Manual on the WMO Information System_): ** Appendix D: WIS2 Topic Hierarchy (WTH) ** Appendix E: WIS2 Notification Message (WNM) format ** Appendix F: WMO Core Metadata Profile version 2 (WCMP2) -** WIS2 Metric Hierarchy (WMH)footnote:[https://github.com/wmo-im/wis2-metric-hierarchy] +** WIS2 Metric Hierarchy (WMH):https://github.com/wmo-im/wis2-metric-hierarchy === 7.2 Informative diff --git a/transition-guide/sections/temporary_global_services.adoc b/transition-guide/sections/temporary_global_services.adoc index cd69f29..1e759a5 100644 --- a/transition-guide/sections/temporary_global_services.adoc +++ b/transition-guide/sections/temporary_global_services.adoc @@ -43,7 +43,7 @@ The WIS2 implementation plan outlines a gradual transition of data exchange from When a National Meteorological Centre (NMC), running a Message Switching System and exchanging data on the GTS, has implemented WIS2, it may wish to stop sending its data directly on the GTS so that it can stop the MSS. -For a Member that wishes to stop its MSS, the WIS2 to GTS gateway will ensure that only data currently available on the GTS will be re-published on the GTS, so that no data is lost during the transition. +For a Member that wishes to stop MSS, the WIS2 to GTS gateway will ensure that only data currently available on the GTS will be re-published on the GTS, so that no data is lost during the transition. To ensure resilient operation, there will be more than one WIS2 to GTS gateway. @@ -91,7 +91,7 @@ During the transition period, other gateways will republish GTS data to WIS2. Th Thanks to the gateway functions previously described, WIS centres that currently use the GTS to exchange operational data and that have successfully implemented a WIS2 Node with the additional features required for the gateways to provide the gateway service, will be able to stop their MSS, if they wish to do so, before the end of the complete migration. Gradually stopping of the whole MSS shall be done in an orderly and coordinated manner so that all data required by Members for their operations will continue to be available. -Section 6 of the present guide describes the various roles of the GTS (NMC, RTH, World Meteorological Centres (WMC)). It also details when a centre can stop its MSS. When all the conditions for a centre are met, the decommissioning procedure in Figure 2 can be applied. +Section 6 of the present guide describes the various roles of GTS (NMC, RTH, World Meteorological Centres (WMC)). It also details when a centre can stop its MSS. When all the conditions for a centre are met, the decommissioning procedure in Figure 2 can be applied. .MSS decommissioning procedure image::images/stopping-mss.png[Figure 2. MSS decommissioning procedure]