You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
In ERCOT, fixed loads submit price offers and are interpreted as "all or nothing" blocks.
We don't have any kind of fixed load cost currently, so we need to add this.
This could be done in two ways: 1) add a new type of bid (other than inc, dec, psl), or 2) allow fixed loads to have bid prices associated with them
The text was updated successfully, but these errors were encountered:
raphaelsaavedra
changed the title
Allow fixed loads to have costs
Allow fixed loads to have bid prices
Sep 26, 2022
In ERCOT, fixed loads submit price offers and are interpreted as "all or nothing" blocks.
We don't have any kind of fixed load cost currently, so we need to add this.
This could be done in two ways: 1) add a new type of bid (other than inc, dec, psl), or 2) allow fixed loads to have bid prices associated with them
The text was updated successfully, but these errors were encountered: