Update BC Address Geocoder Data Processing to eliminate step D3 [CPF batch GSR unit recovery] and decouple step D4 [FME site prep] as shown in the data flow 2 diagram.
Test the elimination of step D3 from the Geocoder data prep process to confirm that the impact on the overall occupants list is minimal. For example, if a unit only record is provided, but we have a parent address, will it still be imported?
If impact will be minimal, eliminate step D3 from BC Address Geocoder Data Processing.
Once step D3 is eliminated, step D4 can be decoupled and simplify the process. Since this step would no longer require pre-geocoding, it could be run independently and only needed when new site data is provided (don’t need to run after ITN updates).
The text was updated successfully, but these errors were encountered:
Update BC Address Geocoder Data Processing to eliminate step D3 [CPF batch GSR unit recovery] and decouple step D4 [FME site prep] as shown in the data flow 2 diagram.
Test the elimination of step D3 from the Geocoder data prep process to confirm that the impact on the overall occupants list is minimal. For example, if a unit only record is provided, but we have a parent address, will it still be imported?
If impact will be minimal, eliminate step D3 from BC Address Geocoder Data Processing.
Once step D3 is eliminated, step D4 can be decoupled and simplify the process. Since this step would no longer require pre-geocoding, it could be run independently and only needed when new site data is provided (don’t need to run after ITN updates).
The text was updated successfully, but these errors were encountered: