Skip to content

adjust csp

adjust csp #431

Triggered via pull request April 29, 2024 17:22
Status Failure
Total duration 5m 14s
Artifacts

pr-open.yml

on: pull_request
Matrix: Builds
Matrix: Tests / E2E
Matrix: Tests / Load
Tests  /  Integration
5s
Tests / Integration
PR Results
0s
PR Results
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Tests / Integration
Process completed with exit code 1.
Tests / Load (backend)
The job was canceled because "frontend" failed.
Tests / E2E (chrome)
The process '/usr/local/bin/npx' failed with exit code 254
Tests / E2E (firefox)
The job was canceled because "chrome" failed.
Tests / E2E (firefox)
The process '/usr/local/bin/npx' failed with exit code 254
Tests / E2E (edge)
The job was canceled because "chrome" failed.
Tests / E2E (edge)
The process '/usr/local/bin/npx' failed with exit code 254
PR Results
Process completed with exit code 1.